The next step in scheduling is to calculate the labor required for the planned work. You can calculate the labor by day or by trade.
|
Datastream strongly recommends that you generate the calculate labor availability report (WBAVAC) and the Calculate labor required per day report (WRRLDG) or the Calculate labor required/available per trade report (WRRLTG) at least once each day. |
Refer to the following topics for information on calculating required labor.