Define your organization’s assets, systems, and functional positions as equipment.
|
You can also use the Assets (OMOBJA), Positions (OMOBJP), and Systems (OMOBJS) forms to more quickly define a particular type of equipment. Define locations on the Locations form (OMLOCA). |
Use asset profiles to create a large number of identical assets very quickly. You can also use Datastream 7i to designate equipment that is subject to the United States Food and Drug Administration (FDA) Current Good Manufacturing Practices (cGMP) standards. Designating an asset as cGMP equipment enables you to configure Datastream 7i to create electronic records and/or require signatures for any work performed on cGMP equipment.
Define equipment before associating parts or permits with that equipment or before setting up parent/child relationships.
|
You can only delete equipment that does not have histories or other associated records. |
The installation parameter ASSETASS determines whether assets are recognized at purchase order creation or upon receipt.
Follow these steps to define equipment.
Open the Equipment form (OMOBJC).
Click the Record view tab. Datastream 7i displays the Record view page.
Equipment—Enter a unique code identifying the equipment, and then enter a description of the equipment in the adjacent field.
|
If the AUTOANUM installation parameter is set to YES, Datastream 7i automatically assigns the equipment number if the Type is Asset and the Equipment code is not entered. |
Organization—Click to select the organization to which the equipment belongs if you use multi-organization security.
Type—Click to select the equipment type (Asset, Position, System). The listed values belong to the OBTP entity.
|
Define location equipment on the Locations form (OMLOCA). |
Department—Click to select the equipment’s department.
Status—Click to select the equipment status. The listed values belong to the OBST entity. Refer to the following list for default status values:
A—Awaiting purchase. Interacts with the purchasing module. If assets are recognized at purchase order creation, then an asset must be created at time of purchase order generation. The ASSETASS installation parameter determines when assets are recognized: at receipt (R) or at purchase order creation (P).
B—Purchased/in store. Reserved for new equipment received into a firm’s store.
C—In store. Assigned when a piece of equipment is transferred to a store (i.e., the item has been removed from stores and then returned for later issue).
CIR—In repair. Assigned when a repairable spare tracked by asset is being repaired internally or externally.
CRR—To be repaired. Assigned when a repairable spare tracked by asset is returned.
D—Withdrawn. Items no longer available for use.
I—Installed. Assigned when a piece of equipment is in place and operating within the business organization.
Status relates directly to the Status change authorization matrix. Do not permit a status change from any other status to Awaiting purchase or from any status other than Awaiting purchase to Purchased/in store.
Datastream 7i assigns Status values of Purchased/in store, To be repaired, or In repair; you should not select these values. Select the Status value Purchased/In store only when defining a piece of equipment in the store.
|
You cannot change the status to CRR—To be repaired or CIR—In repair even though these status changes are allowed on the Status change authorization form (BNAUTH). |
You cannot create work orders when the equipment’s Status is A—Awaiting purchase or D—Withdrawn.
Withdrawal date can only be specified when Status is B—Purchased/in store, C—In store, or D—Withdrawn. Withdrawal date is set when Status is D—Withdrawn. All other data is kept at the old value. It is impossible to set the status to D—Withdrawn if the piece of equipment has a parent.
Class—Click to select the class of the equipment. The classes shown belong to the OBJ entity.
cGMP—Select to indicate that the equipment is subject to cGMP regulations.
Production—Select if the equipment is used in production.
Category—Click to select the equipment’s category.
Safety—Select to observe safety precautions when working with this piece of equipment.
Out of service—Select if the piece of equipment is not used and should not appear in the list of values.
Parent—Click to select the equipment’s parent equipment, if applicable. Parent equipment must be the same type as child equipment. Datastream 7i automatically populates this field if the equipment is part of an equipment hierarchy.
Dependent—Select to indicate if the equipment is dependent on the parent equipment. If the parent equipment moves to another location and the child equipment automatically moves with it, then the child equipment is dependent on the required parent equipment.
Location—Click to select the equipment’s location, if applicable. Location is not applicable if the equipment has a parent and is dependent.
Position—Click to select the functional position occupied by the asset. Select only if the equipment type is Asset. Datastream 7i automatically populates this field if the equipment is part of an equipment hierarchy.
Manufacturer—Click to select the equipment’s manufacturer.
Assigned to—Click to select the person responsible for the equipment.
Serial number—Enter the equipment’s serial number as necessary.
Model—Enter the equipment’s model number.
Revision—Enter the manufacturer’s revision number.
Commission date—Enter the equipment’s installation date.
|
The Commission date defaults to the current date when you create a piece of equipment. |
Value—Enter the equipment’s value (generally, purchase price).
Meter unit—Click to select the equipment’s primary unit of measure.
If you enter a meter unit, also associate the unit of measure with the equipment on the Meter usage definitions form (ODUSGD).
Criticality—Click to select a criticality code to indicate the relative importance of the equipment to the overall production of goods or services for your organization.
Criticality proceeds to work orders when the equipment requires maintenance. The listed values belong to the OBCR entity.
Cost code—Click to select the equipment’s cost code.
Click More. Datastream 7i displays additional fields. Some of these fields are used to define the equipment as a part or to define VMRS equipment.
Store—Click to select the store in which the by asset equipment is stocked.
|
You can enter a Store and Bin only if the equipment’s Status is Purchased/In store. |
Bin—Click to select the bin storing the equipment.
State—Click to select the equipment state. The listed values belong to the OBSA entity.
Prevent WO completion—Select to indicate that work orders for this piece of equipment should not be closed.
Variable 1 - Variable 6—Enter information in these fields as necessary. Contact your system administrator about customizing or removing these fields. These fields are also used as equipment aliases.
|
If you transfer the asset between organizations, Datastream 7i displays the Transfer date for the asset. |
Dormant start—Enter the date on which the dormant period for any PM work orders for the equipment begins.
Dormant end—Enter the date on which the dormant period for any PM work orders for the equipment ends.
Sold/scrapped date—Enter the date after which to stop calculating depreciation expense and book value for the asset.
Reuse dormant period—Select to use the same specified dormant period for any PM work orders for the equipment on a yearly basis. If you select Reuse dormant period, Datastream 7i automatically updates the specified Dormant start and Dormant end dates to future dates after the dormant period for the equipment has elapsed. Additionally, the specified dormant period will be the default dormant period for any new PM equipment records.
|
Click Update PMs as necessary to copy the specified dormant period information to any PM equipment records on the Preventive maintenance schedules form (WMPPMS). If you update a dormant period from an equipment record, and then click Update PMs, the dormant period is also updates on any PM work orders for the equipment on the Equipment tab of the Preventive maintenance work orders form (WMPPMS). Updating the dormant period for the equipment does not affect any existing released PM work orders based on the former dormant period for the equipment. However, any subsequent releases of the PM will be based only on the due dates and nesting references (if applicable) for the PM. You cannot update dormant periods for PM equipment on the Equipment form (OMOBJC) if the PMRVCTRL installation parameter is set to ON. |
Choose File | Save from the menu bar. Datastream 7i saves the information to the database.